ENGworks has developed an efficient process to capture all the changes that took place during construction. By utilizing As-Built drawings and/or sub-contractor mark-ups, ENGworks incorporates the information into the BIM to generate As-Built models.
Project Close-out often becomes a difficult stage for General Contractors when the information required for this purpose is inaccessible or misplaced. We build the BIM and link all building design data, cut-sheet data, field changes, and other required documentation for Close-out in the interest of assisting any/all contractors during this stage. The BIM becomes a single source of information and a central database. Additionally, when a 6D Facility Management solution is planned at a later stage, ENGworks will integrate all necessary metadata of the model for future use.


